N601WD - Example of Zenith Zodiac CH 650 ( http://www.zenithair.com/zodiac/ch650/index.html )
|
Features and internal structure of Zodiac CH 650.
|
May 19, 2009 - Took demo ride at Zenith Aircraft factory in Mexico, MO. Purchased kit.
|
June 19, 2009 - Crate containing complete kit arrived. Parts visible are the fuel tanks.
|
July 1, 2009 - Starting rudder assembly. Making first cut on first part of the airplane.
|
Rudder assembled with clecos (temporary fasteners).
|
Final riveting of rudder.
|
July 4, 2009 - Rudder completed. First component of the airplane.
|
Internal structure of horizontal stabilizer.
|
Wrapping skin on stabilizer.
|
July 15, 2009 - Horizontal stabilizer completed.
|
|
Testing and calibrating electric elevator trim control.
|
Grandson, Jordan, fascinated by riveting process.
|
July 26, 2009 - Elevator completed and connected to stabilizer with clecos. Tail section
now complete. Total rivets used to date = 1035.
|
|
Back to Zodiac Update MAIN PAGE>>